Home / Roadmap
Roadmap & status
What works today, what comes next, and what isn't ready yet, stated plainly. We don't publish dates we can't commit to.
-
✓
Phase 1 · Devnet Done
The chain runs end to end on a local network of 4 validators.
- Accounts, signed transfers, fees and memos
- BFT validator voting with one-block finality
- Post-quantum signatures at NIST category 5: ML-DSA-87 (FIPS 204) for wallets and validator votes
- Rotation from any key to a different post-quantum key, migration commitments, and scheduled retirement of any algorithm
- Migration commitments, so a quantum attacker with an old key can't redirect a migration
- Hash-based SLH-DSA-256s (FIPS 205, category 5) vaults as a second, independent post-quantum family
- 256-bit addresses and a block size limit for large signatures
- Fixed supply of 500,000,000 ARKTH enforced by every node
- Block explorer, faucet and command-line wallet
- 28 automated tests, including attack, outage and migration scenarios
-
Phase 2 · Public testnet Live
Live since 19 Nov 2026: website, explorer, RPC and faucet at arkthro.com, and automatic peer discovery so a new node joins with one address. In progress: independent validators, stress tests and security audits.
Open the network to the public, still with test ARKTH that has no value.
- Validators on separate machines, run by independent operators
- Hosted explorer and faucet at arkthro.com
- Encrypted, authenticated connections between nodes (ML-KEM-768) Built
- Rate limits and protection against spam on public endpoints
- Wallet app for sending and receiving without the command line
-
Phase 3 · Staking & programmability
- Joining and leaving the validator set by staking ARKTHRO Built
- Penalties (slashing) for validators that sign conflicting blocks or stay offline Built
- Smart contracts, so applications can be built on ARKTHRO
- Faster storage for a long-running chain
-
Phase 4 · Audit & legal review
- Independent third-party security audit of the node and consensus
- Publish the ARKTHRO allocation and any unlock schedule
- Legal review under Philippine SEC, BSP and AMLC rules before any distribution
-
Phase 5 · Mainnet
Launch only after the audit is complete and the legal review is cleared.
Status & limits
Known limitations today
These are the reasons ARKTHRO is not ready for real value yet.
| Area | Today | Planned |
|---|---|---|
| Decentralization | All 4 devnet validators run on one machine | Independent operators (phase 2) |
| Validator set | Staking is built: validators join and leave by staking ARKTHRO, one vote each | Live on the public testnet (phase 2) |
| Misbehaviour | Slashing is built: double-signing and long downtime are penalized | Live on the public testnet (phase 2) |
| Networking | Built: encrypted, authenticated node links (ML-KEM-768, ML-DSA, AES-256-GCM) and peer announcements | Live on the public testnet (phase 2) |
| Applications | ARKTHRO transfers only | Smart contracts (phase 3) |
| Security review | Internal tests only | Independent audit (phase 4) |
| Token | Test ARKTH, no value; allocation not decided | Published before mainnet (phase 4) |
Our consensus is tested; our network is not yet decentralized. We'd rather under-claim and let you verify than ask you to trust us.